{"id":455261,"date":"2026-07-13T03:15:02","date_gmt":"2026-07-13T10:15:02","guid":{"rendered":"https:\/\/climatescience.press\/?p=455261"},"modified":"2026-07-13T03:15:04","modified_gmt":"2026-07-13T10:15:04","slug":"vineyard-winds-troubles-mount-despite-political-victory-lap","status":"publish","type":"post","link":"https:\/\/climatescience.press\/?p=455261","title":{"rendered":"Vineyard Wind\u2019s Troubles Mount Despite Political Victory Lap"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"723\" height=\"485\" data-attachment-id=\"455271\" data-permalink=\"https:\/\/climatescience.press\/?attachment_id=455271\" data-orig-file=\"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?fit=1168%2C784&amp;ssl=1\" data-orig-size=\"1168,784\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;,&quot;alt&quot;:&quot;&quot;}\" data-image-title=\"0 Vineyard Wind 1\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?fit=723%2C485&amp;ssl=1\" src=\"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?resize=723%2C485&#038;ssl=1\" alt=\"\" class=\"wp-image-455271\" srcset=\"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?resize=1024%2C687&amp;ssl=1 1024w, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?resize=300%2C201&amp;ssl=1 300w, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?resize=768%2C516&amp;ssl=1 768w, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?resize=640%2C430&amp;ssl=1 640w, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?w=1168&amp;ssl=1 1168w\" sizes=\"auto, (max-width: 723px) 100vw, 723px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">From <a href=\"https:\/\/wattsupwiththat.com\/2026\/07\/11\/vineyard-winds-troubles-mount-despite-political-victory-lap\/\">Watts Up With That?<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/legalinsurrection.com\/2026\/07\/vineyard-winds-troubles-mount-despite-political-victory-lap\/\">From Legal Insurrection<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Troubled windfarm is producing less than half the promised output, sensors are repeatedly tripping offline, and it\u2019s engaged in a legal battle with its turbine manufacturer.<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Posted by&nbsp;<a href=\"https:\/\/legalinsurrection.com\/author\/leslieeastman\/\">Leslie Eastman<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"http:\/\/i%20am%20continuing%20to%20keep%20an%20eye%20on%20the%20vineyard%20farms%20offshore%20blade%20failure%20near%20nantucket.xn--%20a%20few%20weeks%20ago%20the%20facility%20was%20closed%20because%20of%20the%20failure%20of%20vineyard%20winds%20newly%20installed%20wind%20turbines,%20and%20the%20city%20was%20poised%20to%20sue-tl80k.%20after%20one%20blade%20failed%20and%20ended%20up%20in%20the%20water,%20the%20beaches%20were%20cluttered%20with%20sharp%20fiberglass%20shards,%20which%20is%20a%20sub-optimum%20condition%20at%20the%20height%20of%20the%20summer%20tourist%20season.%20continuing%20investigation%20into%20the%20cause%20of%20this%20environmental%20contamination%20incident%20determined%20that%20a%20manufacturing%20flaw%20in%20the%20blade%20was%20responsible%20for%20the%20failure.\/\" target=\"_blank\" rel=\"noopener\">Two summers ago<\/a>, we began following the saga of the Vineyard Farms offshore wind project and its blade failure near Nantucket.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After one blade failed and&nbsp;fell into the water, the beaches were littered with&nbsp;<a href=\"https:\/\/legalinsurrection.com\/2024\/07\/environmentally-friendly-wind-turbine-fails-spreading-fiberglass-shards-over-nantucket-beaches\/\" target=\"_blank\" rel=\"noopener\">sharp fiberglass shards<\/a>, creating&nbsp;a suboptimal&nbsp;condition at the height of the summer tourist season.&nbsp; The continuing investigation into the cause of this environmental contamination incident determined that a&nbsp;<a href=\"https:\/\/legalinsurrection.com\/2024\/08\/manufacturing-flaw-now-blamed-for-vineyard-wind-offshore-blade-failure\/\">manufacturing flaw in the blade<\/a>&nbsp;was responsible for the failure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Subsequently, residents of Nantucket began&nbsp;<a href=\"https:\/\/legalinsurrection.com\/2024\/08\/nantucket-residents-now-want-to-freeze-offshore-wind-farms-following-vineyard-wind-blade-failure\/\" target=\"_blank\" rel=\"noopener\">demanding the end of these mammoth<\/a>&nbsp;offshore wind farms, and&nbsp;<a href=\"https:\/\/legalinsurrection.com\/2024\/08\/new-england-fishermen-stage-floating-protest-at-vineyard-wind-site\/\" target=\"_blank\" rel=\"noopener\">fishermen protested&nbsp;<\/a>at the site of the blade failure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Massachusetts Governor Maura Healey declared victory last month, celebrating the completion of Vineyard Wind as a shining beacon of \u201cenergy independence\u201d that would&nbsp;<a href=\"https:\/\/dailyenergyinsider.com\/news\/52076-massachusetts-gov-healey-activates-contracts-for-vineyard-wind\/\" target=\"_blank\" rel=\"noopener\">slash electricity costs<\/a>.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u201cVineyard Wind is a key part of our all-of-the-above strategy to lowering energy prices,\u201d Healey said. \u201cThroughout one of the coldest winters in recent history, Vineyard Wind turbines powered our homes and businesses at a low price and now that price goes even lower with the activation of these contracts. Especially as President Trump is taking energy sources off the table and increasing prices with his war in Iran, we should be leaning into more American-made wind power to lower costs, create jobs, and make our country more energy independent.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This past winter, Vineyard Wind lowered electricity prices by competing in wholesale electricity markets. In those markets, it consistently offered lower prices than other sources of electricity. This activation of the utilities\u2019 contracts further lowers the price of electricity generated by Vineyard Wind.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">However, the celebration may have been premature. Apparently, the wind farm is producing barely 300 megawatts (less than half the promised output), and&nbsp;<a href=\"https:\/\/www.washingtontimes.com\/news\/2026\/jul\/4\/americas-first-major-offshore-wind-project-running-plagued-problems\/\" target=\"_blank\" rel=\"noopener\">sensors are repeatedly tripping offline<\/a>.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">In a May 1 court filing, Vineyard Wind CEO Klaus Moeller said the project\u2019s current average output is roughly 300 megawatts, and 13 of the 62 turbines are not yet activated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Significant remedial and repair work is needed to address \u201crecurrent operational issues,\u201d Vineyard Wind officials said in court documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The problems include sensors that repeatedly trip, causing the turbines to shut off and curtailing their performance and power generation.<\/p>\n<\/blockquote>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-twitter wp-block-embed-twitter\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"embed-x\"><blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\"><p lang=\"en\" dir=\"ltr\">Vineyard Wind is struggling with operational defects and legal battles after the completion of its first major U.S. offshore project off the Massachusetts coast. <a href=\"https:\/\/t.co\/t9sfVd7DQ8\">https:\/\/t.co\/t9sfVd7DQ8<\/a> <a href=\"https:\/\/t.co\/nCxTz7VGIs\">pic.twitter.com\/nCxTz7VGIs<\/a><\/p>&mdash; The Washington Times (@WashTimes) <a href=\"https:\/\/x.com\/WashTimes\/status\/2073889689828770247?ref_src=twsrc%5Etfw\">July 5, 2026<\/a><\/blockquote><script async src=\"https:\/\/platform.x.com\/widgets.js\" charset=\"utf-8\"><\/script><\/div>\n<\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Furthermore, the developer is locked in a bitter $853 million lawsuit to stop turbine-maker GE Vernova&nbsp;<a href=\"https:\/\/nantucketcurrent.com\/news\/vineyard-wind-prevails-in-lawsuit-against-turbine-manufacturer\" target=\"_blank\" rel=\"noopener\">from walking away from the project<\/a>, which would essentially leave it a \u201cdormant wind farm graveyard\u201d.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">A Boston judge has affirmed his own ruling that&nbsp;<a href=\"https:\/\/nantucketcurrent.com\/news\/judge-grants-temporary-injunction-to-block-turbine-maker-from-abandoning-vineyard-wind-project\" target=\"_blank\" rel=\"noopener\">temporarily blocks GE Renewables from exiting<\/a>&nbsp;its contract with Vineyard Wind, compelling the subsidiary of GE Vernova to continue servicing and maintaining the wind farm southwest of Nantucket.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Judge Peter Krupp this week rejected a pair of motions from GE Renewables that asked him to reconsider his previous order and send the case to arbitration. GE Renewables, the manufacturer of the offshore wind turbines used by Vineyard Wind, has been trying to leave the project, arguing that the offshore wind company owes them $300 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vineyard Wind has countered by claiming that it is actually GE Renewables that owes them $500 million stemming from the&nbsp;<a href=\"https:\/\/nantucketcurrent.com\/news\/vineyard-wind-reports-turbine-blade-damage-in-offshore-incident\" target=\"_blank\" rel=\"noopener\">collapse of a GE-manufactured turbine blade<\/a>&nbsp;in July of 2024, which littered Nantucket\u2019s beaches with debris and forced the wind farm to temporarily shut down while the cause of the break was identified. Ultimately, more than 60 blades had to be replaced. Vineyard Wind has also said that GE Renewables\u2019 exit would endanger the very existence of the project,&nbsp;<a href=\"https:\/\/www.n-magazine.com\/could-vineyard-wind-become-a-turbine-graveyard\" target=\"_blank\" rel=\"noopener\">possibly leaving behind<\/a>&nbsp;a \u201cdormant wind farm graveyard\u201d. So far, the courts have sided with Vineyard Wind.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Meanwhile, Massachusetts\u2019 latest offshore wind procurement round has been delayed yet again, pushing the contract completion deadline to January 29, 2027, and leaving the process roughly&nbsp;<a href=\"https:\/\/newbedfordlight.org\/offshore-wind-faces-yet-another-delay\/\" target=\"_blank\" rel=\"noopener\">two and a half years behind schedule<\/a>.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Massachusetts selected 2,678 megawatts of offshore wind power spread across three projects in September 2024, kicking off contract talks that are expected to result in higher prices for power than past projects. During the repeated delays, one of the selected projects has removed itself from consideration and another raised the potential for a multi-year delay.<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">Officials say contract negotiations are still ongoing and are expected to result in higher power prices than in previous rounds, extending uncertainty for developers, ratepayers, and the region\u2019s climate and energy planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It appears that when you build a $4.5 billion monument to green ideology on the Massachusetts coast, break a 351-foot turbine blade and dump 57 tons of fiberglass debris onto Nantucket\u2019s beaches, then run out of money to pay the contractor who installed your turbines, the laws of physics and finance remain very strongly in place.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here\u2019s hoping the good people of the region have enough energy for both \u201cheat domes\u201d and the winter season.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vineyard Wind 1, the first large-scale U.S. offshore wind farm (800 MW, 62 turbines off Massachusetts), has faced persistent technical, contractual, and operational challenges even after completing physical installation in March 2026.<\/p>\n","protected":false},"author":121246920,"featured_media":455271,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_wpcom_ai_launchpad_first_post":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"Vineyard Wind 1, the first large-scale U.S. offshore wind farm (800 MW, 62 turbines off Massachusetts), has faced persistent technical, contractual, and operational challenges even after completing physical installation in March 2026.\n\n","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1],"tags":[691844040,691818677,691844039,691829816,691818301,691829763],"class_list":["post-455261","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-ge-renewables","tag-green-ideology","tag-massachusetts-governor-maura-healey","tag-nantucket","tag-offshore-wind","tag-vineyard-wind","fallback-thumbnail"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2026\/07\/0-Vineyard-Wind-1.jpg?fit=1168%2C784&ssl=1","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/paxLW1-1UqV","jetpack-related-posts":[{"id":336985,"url":"https:\/\/climatescience.press\/?p=336985","url_meta":{"origin":455261,"position":0},"title":"Vineyard Wind Turbine Failure: Incident Details, Regulatory Response, and Industry Implications","author":"uwe.roland.gross","date":"07\/19\/2024","format":false,"excerpt":"On July 13, 2024, an offshore wind turbine at the Vineyard Wind 1 project experienced a significant blade failure, leading to debris washing up on Nantucket\u2019s beaches and prompting a federal shutdown of the wind farm. This incident raises obvious questions about the safety and reliability of offshore wind projects,\u2026","rel":"","context":"In \"offshore wind turbine\"","block_context":{"text":"offshore wind turbine","link":"https:\/\/climatescience.press\/?tag=offshore-wind-turbine"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-1-Offshore-Windpark-Symbolfoto.jpg?fit=1200%2C720&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-1-Offshore-Windpark-Symbolfoto.jpg?fit=1200%2C720&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-1-Offshore-Windpark-Symbolfoto.jpg?fit=1200%2C720&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-1-Offshore-Windpark-Symbolfoto.jpg?fit=1200%2C720&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-1-Offshore-Windpark-Symbolfoto.jpg?fit=1200%2C720&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":337011,"url":"https:\/\/climatescience.press\/?p=337011","url_meta":{"origin":455261,"position":1},"title":"Vineyard Wind: Catastrophic Failure (\u2018sharp fiberglass shards\u2019 close Nantucket beaches)","author":"uwe.roland.gross","date":"07\/20\/2024","format":false,"excerpt":"\u201cThe Biden Administration\u2019s offshore wind ambition, not only Vineyard Wind, is going the way of the EV debacle. It is time to end the charade, even before the Presidential election.\u201d","rel":"","context":"In \"offshore wind\"","block_context":{"text":"offshore wind","link":"https:\/\/climatescience.press\/?tag=offshore-wind"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-Infographic.webp?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-Infographic.webp?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-Infographic.webp?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-Infographic.webp?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/07\/0Vineyard-Wind-Infographic.webp?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":341343,"url":"https:\/\/climatescience.press\/?p=341343","url_meta":{"origin":455261,"position":2},"title":"New England Fishermen Stage Floating Protest at Vineyard Wind Site","author":"uwe.roland.gross","date":"09\/02\/2024","format":false,"excerpt":"I am continuing to keep an eye on the Vineyard Farms offshore blade failure near Nantucket. A few weeks ago the facility was closed because of the failure of Vineyard Wind\u2019s newly installed wind turbines, and the city was poised to sue.","rel":"","context":"In \"National Oceanic and Atmospheric Administration Fisheries\"","block_context":{"text":"National Oceanic and Atmospheric Administration Fisheries","link":"https:\/\/climatescience.press\/?tag=national-oceanic-and-atmospheric-administration-fisheries"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Wind-turbines_sstock_1500.webp?fit=1200%2C718&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Wind-turbines_sstock_1500.webp?fit=1200%2C718&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Wind-turbines_sstock_1500.webp?fit=1200%2C718&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Wind-turbines_sstock_1500.webp?fit=1200%2C718&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Wind-turbines_sstock_1500.webp?fit=1200%2C718&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":358413,"url":"https:\/\/climatescience.press\/?p=358413","url_meta":{"origin":455261,"position":3},"title":"Vineyard Offshore Halts Major Wind Project Amid Economic and Policy Challenges","author":"uwe.roland.gross","date":"12\/23\/2024","format":false,"excerpt":"The offshore wind industry faced another setback as Vineyard Offshore announced the withdrawal of an 800 MW wind energy project from Massachusetts\u2019 procurement process. The decision follows Connecticut\u2019s refusal to participate in a tri-state wind energy agreement, leaving Vineyard unable to secure contracts for the full 1,200 MW Vineyard Wind\u2026","rel":"","context":"In \"financial realities\"","block_context":{"text":"financial realities","link":"https:\/\/climatescience.press\/?tag=financial-realities"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/12\/zScreenshot-2023-11-03-111148-1024x611-1.webp?fit=1024%2C611&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/12\/zScreenshot-2023-11-03-111148-1024x611-1.webp?fit=1024%2C611&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/12\/zScreenshot-2023-11-03-111148-1024x611-1.webp?fit=1024%2C611&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/12\/zScreenshot-2023-11-03-111148-1024x611-1.webp?fit=1024%2C611&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":341425,"url":"https:\/\/climatescience.press\/?p=341425","url_meta":{"origin":455261,"position":4},"title":"Looming \u2018clean\u2019 energy disasters off our coasts","author":"uwe.roland.gross","date":"09\/03\/2024","format":false,"excerpt":"Photos of oil-covered seals and birds from California\u2019s 1969 Santa Barbara blowout helped launch the environmental and stop-oil movements. More recently, the 2010 Deepwater Horizon drillship disaster killed eleven workers and blasted 3-4 million barrels of oil and enormous amounts of natural gas into the Gulf of Mexico.","rel":"","context":"In \"clean energy\"","block_context":{"text":"clean energy","link":"https:\/\/climatescience.press\/?tag=clean-energy"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Nantucket-Wind-Turbine-Hazmat-Cleanup.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Nantucket-Wind-Turbine-Hazmat-Cleanup.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Nantucket-Wind-Turbine-Hazmat-Cleanup.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Nantucket-Wind-Turbine-Hazmat-Cleanup.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/09\/0Nantucket-Wind-Turbine-Hazmat-Cleanup.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":344917,"url":"https:\/\/climatescience.press\/?p=344917","url_meta":{"origin":455261,"position":5},"title":"Wind Power Pollution and Hypocrisy in New\u00a0England","author":"uwe.roland.gross","date":"10\/02\/2024","format":false,"excerpt":"A fractured turbine\u2019s blade in Nantucket is causing ongoing problems and frustrating local residents.","rel":"","context":"In \"fractured turbine\u2019s blade\"","block_context":{"text":"fractured turbine\u2019s blade","link":"https:\/\/climatescience.press\/?tag=fractured-turbines-blade"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/10\/0nicholas-doherty-pONBhDyOFoM-unsplash.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/10\/0nicholas-doherty-pONBhDyOFoM-unsplash.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/10\/0nicholas-doherty-pONBhDyOFoM-unsplash.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/10\/0nicholas-doherty-pONBhDyOFoM-unsplash.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/climatescience.press\/wp-content\/uploads\/2024\/10\/0nicholas-doherty-pONBhDyOFoM-unsplash.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/climatescience.press\/index.php?rest_route=\/wp\/v2\/posts\/455261","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/climatescience.press\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/climatescience.press\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/climatescience.press\/index.php?rest_route=\/wp\/v2\/users\/121246920"}],"replies":[{"embeddable":true,"href":"https:\/\/climatescience.press\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=455261"}],"version-history":[{"count":10,"href":"https:\/\/climatescience.press\/index.php?rest_route=\/wp\/v2\/posts\/455261\/revisions"}],"predecessor-version":[{"id":455274,"href":"https:\/\/climatescience.press\/index.php?rest_route=\/wp\/v2\/posts\/455261\/revisions\/455274"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/climatescience.press\/index.php?rest_route=\/wp\/v2\/media\/455271"}],"wp:attachment":[{"href":"https:\/\/climatescience.press\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=455261"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/climatescience.press\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=455261"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/climatescience.press\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=455261"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}